Vehicle emissions inspection and maintenance program is behind schedule

Vehicle emissions inspection and maintenance program is behind schedule

4.11 - 1251 ratings - Source



According to the paper, the failure rate found was low when compared with the failure rate of 39 to 46 percent, which EPA found existed for a sample of 1975-77 models in its Portland, Oregon, study. EPA also found that newer vehiclesanbsp;...


Title:Vehicle emissions inspection and maintenance program is behind schedule
Author: United States. General Accounting Office
Publisher: - 1985
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA